(Image: https://homedepot.scene7.com/is/image/homedepotcanada/p_1000803668.jpg?wid=1000&hei=1000&op_sharpen=1)Choose the hardwood species and board widths for the room installation. Put one 1/2-inch spacer against every wall and slide the tip of the board up towards those spacers. Put the primary board up in opposition to the mason's line with the groove side facing away from the walls. Install threshold or transition strips in place the place the sting of the floor is uncovered. Hold your trowel at a 45-degree angle to unfold the glue in small sections. Mark the partitions to indicate the situation of the ground joists. Cut off the tongue whether it is on the edge that meets the obstruction. Install the the rest of the ground as you normally would, becoming the pieces into the frame as you go. Glue-down, or adhesive, installation is a well-liked possibility for engineered flooring. It is typically clicked together and secured with glue. Install the baseboard and www.canadafloorsdepot.com shoe moulding to cover the growth gap. Keep the decrease fringe of the baseboard even with the highest of the floor and nail the baseboard into the wall. Cut the last board of the row to fit, leaving a 3/4-inch expansion hole. Cut the last board of the row to suit using a table noticed, leaving a 3/4-inch expansion hole.